All India Coal Production target for 2016-17 fixed at 724.71 MT: Shri Piyush Goyal
12 December 2016
A roadmap has been prepared by Coal India Limited (CIL) to substantially enhance production of coal to 1 Billion Tonnes by 2019-20 from the current level of production of 538.75 MT in 2015-16. As per Annual Plan document of Ministry of Coal, all India target of coal production for 2016-17 was fixed at 724.71 MT. This was stated by the Union Minister of State (IC) For Power, Coal, New & Renewable Energy and Mines, Shri Piyush Goyal, in a written reply, in Lok Sabha today.
Shri Goyal informed the house that the focus of the Government is to increase the domestic production of coal which includes efforts to expedite Environment clearances & Forest clearances, pursuing with State Government for assistance in land acquisition and coordinated effort with Railways for movement of coal. This includes capacity addition from new projects, use of mass production technologies and identification of existing on-going projects with growth potential.
The Minister added that steps have also been taken by CIL and its subsidiaries to improve the production of coal by adopting latest available technologies such as Continuous Miners, Selective Mining, Surface Miners and clean Coal Technologies, Coal sizing and sampling technologies.
Source – PIB
Leave a Reply
Want to join the discussion?Feel free to contribute!