Rail cargo volume set to grow 5% this fiscal

15 January 2018

After a gap of three years, the Railways may post nearly 5% growth in cargo volume this fiscal, with coal contributing a little less than half of the total volume.

During the first nine months of this fiscal, the Railways carried about 849 million tonnes cargo, registering a 4.8% growth.

According to sources, January-March being the peak period, the trend may gain momentum and the Railways will finish close to the targeted volume of 1,167 mt, against last year’s total of 1,108 mt.

The volume of coal, which contributes 48-49% of the total, increased 2.7%; raw materials for steel plant, except iron ore, increased 6%, and volume of steel cargo had shot up by a staggering 15%.

Revenue grew faster than cargo volume at 8.11%, presumably due to adjustments in tariff. And coal consumers were the biggest casualty as revenues from coal freight increased 10.18% against less than 3% volume growth.

In comparison, steel consumers are less affected. Revenue from steel raw materials, except iron ore, moved up 10.7% faster than the volume growth. However, the growth of revenue from steel products is lower (10.7%) than the volume growth.

Safety vs projects

Railway officials hold this year’s cargo growth as exceptional as it came on a high base and despite poor track capacity.

According to sources in the Railways, better coordination between Coal India and the Railways contributed significantly to this year’s performance.

Loading time

CIL has reduced its loading time in sidings.

To ensure faster turnaround of rakes and higher sales of coal, the Railways was asked to divert rakes to more efficient sidings.

Sources, however, point out that to ensure similar growth in despatches in the days to come, coal consumers have to invest in handling infrastructure.

Power and steel plants currently take eight to 10 hours to unload a rake as against the estimated five to six hours, slowing down the movement.

New projects

Recent slowdown in construction of new projects may also affect cargo growth in the future.

The slowdown is attributed to shift in focus on renewal of old and unsafe tracks, following a string of accidents.

New projects are suffering as rails are diverted to track renewal programmes.

Source: THE HINDU BUSINESSLINE

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *